The Structural and Geotech group has officially started the design of the clinic!
For the past few weeks we have been meeting - updating drawings, finalizing loads, researching codes, updating the ever changing BOD, and even the modeling of the building in etabs.
Last week we had an updated meeting with the Architectural group to trade ideas and get pointed in the right direction.
Sunday, February 22, 2009
Subscribe to:
Posts (Atom)